No |
Project
Titles |
Date
of Commencement |
Date
of Completion |
Approved
Sum (RM) |
Progress
Work (%) |
1 |
The Performance
of Load Bearing Pile of Steel Section with Trapezoid
Web.
- Prof. Madya Ir. Dr. Mohd Hanim Osman
- Universiti Teknologi Malaysia (UTM)
.
|
15/02/2005 |
14/02/2008 |
RM164,900.00 |
75% |
2 |
Quantitative Safety and Health Assessment Model
for IBS Construction.
- En. Ahmadon Ahmad
- Universiti Teknologi Malaysia (UTM)
.
|
02/08/2007 |
01/08/2009 |
RM246,600.00 |
10% |
3 |
Performance of Connections in Precast Concrete
Wall Panels under Variable Loads.
- Prof. Madya Dr. Ahmad Baharuddin Abdul Rahman
- Universiti Teknologi Malaysia (UTM)
.
|
02/08/2007 |
01/08/2009 |
RM754,000.00 |
10% |
4 |
A Computerised Work Activities Extraction from
Digital Drawing.
- Prof. Dr. Muhd Zaimi Abd. Majid
- Universiti Teknologi Malaysia (UTM)
.
|
01/12/2005 |
30/11/2008 |
RM1,100,000.00 |
30% |
5 |
Development
of Performance Forecasting Index and Computer
Modelling System for Contractor in Government's
Projects.
- En. Abdul Rahman Ayub
- Universiti Teknologi MARA (UiTM)
.
|
19/01/2007 |
19/01/2009 |
RM361,975.00 |
40% |
6 |
Materials Security and Waste Management for Industrialized
Building Systems (IBS): Towards Sustainable Construction
(Phase 1 & 2).
- Prof. Madya Dr. Joy Jacqueline Pereira
- Universiti Kebangsaan Malaysia (UKM)
. |
01/06/2005 |
31/12/2009 |
RM1,009,200.00 |
60% |
7 |
Development of Lightweight Ferro-Cement Cellular
Panel for Modular Housing and Industrialised Building
System.
- Prof. Ir. Dr. Mahyuddin Ramli
- Universiti Sains Malaysia (USM)
. |
27/10/2004 |
26/10/2007
(Extended to 25/01/2008) |
RM939,000.00 |
85% |
8 |
Utilisation
of Waste Materials for the Production of Concrete
Pedestrian Block (CPB).
- Dr. Mashitah Mat Don
- Universiti Sains Malaysia (USM)
.
|
29/12/2006 |
28/12/2008 |
RM352,139.12 |
20% |
9 |
Semi-Precast Lightweight Flooring Slab.
- Dr. Md. Abdul Mannan
- Universiti Malaysia Sabah (UMS)
. |
01/12/2005 |
01/03/2009 |
RM587,200.00 |
60% |
10 |
National Research Programme on Affordable Quality
Housing (AQH).
- Prof. Ir. Abang Abdullah Abang Ali
- Universiti Putra Malaysia (UPM)
. |
01/06/2002 |
30/05/2007
31/12/2006 |
RM1,304,650.00 |
100%
Reduced Scope |
11 |
The Potential of Contract and Tender Document
as Part of Occupational Safety and Health Management
System.
- Prof. Madya Sr. Khairuddin Sulaiman
- CREAM / Universiti Malaya (UM)
. |
29/01/2008 |
28/07/2008 |
RM220,000.00 |
15% |
12 |
Development of JKR / Malaysia Standard Joint for
IBS Component.
- Ir. Dr. Ismail Mohamed Taib
- CREAM / JKR / CIDB
. |
June
2008 |
January
2010 |
RM994,000.00 |
5% |
13 |
Technology Transfer Model for Benchmarking and
Capturing EU Best Practices in IBS.
- Ir. Dr. Zuhairi Abd. Hamid
- Construction Research Institute of Malaysia
(CREAM)
. |
31/10/2007 |
30/10/2011 |
RM537,000.00 |
15% |
14 |
Supply Chain Management in the Malaysian Construction
Industry.
- Prof. Ir. Dr. Che Sobry Abdullah
- Universiti Utara Malaysia (UUM) / CIDB / CREAM
. |
TBD |
TBD |
RM365,890.00 |
. |