No
Project Titles
Date of Commencement
Date of Completion
Approved Sum (RM)
Progress Work (%)
1


Creep, Shrinkage and Elastic Modules Data of Malaysian Concrete.
- Prof. Madya Ir. Dr. Wahid Omar
- Universiti Teknologi Malaysia (UTM)
.

09/04/2003
08/04/2006
(Extended to 08/10/2006)
RM630,500.00
Completed
2


Design Procedure of the Use of Partial Strength Joints and Composite Connections on Multi-Storey Frames using TWP Sections.
- Prof. Madya Ir. Dr. Mahmood Md. Tahir
- Universiti Teknologi Malaysia (UTM)
.

15/02/2005
14/02/2007
RM619,000.00
Completed
3


Hybrid Beam-to-Column Connection for Precast Concrete Frames.
- Prof. Madya Dr. Ahmad Baharuddin Abdul Rahman
- Universiti Teknologi Malaysia (UTM)
.

19/09/2005
20/09/2007
RM263,700.00
Completed
4


Seismic Hazard Analysis of Peninsular Malaysia for Structural Design Purposes.
- Prof. Dr. Azlan Adnan
- Universiti Teknologi Malaysia (UTM)
.

15/02/2005
14/02/2007 (Extended to 31/05/2007)
RM1,158,080.00
Completed
5

Durability and Engineering Properties of Slag Cement Based Aerated Lightweight Concrete Blocks for Housing.
- Prof. Ir. Dr. Hj. Mohd Warid Hussin
- Universiti Teknologi Malaysia (UTM)
.
15/02/2005
14/02/2005 (Extended to 31//07/2007
RM306,000.00
Completed
6

Development of Local Grout Repair Materials for General Purposes.
- Prof. Ir. Dr. Hj. Mohd Warid Hussin
- Universiti Teknologi Malaysia (UTM)
.
15/02/2005
14/02/2007 (Extended to 31/07/2007)
RM226,000.00
Completed
7

Database for Fibre Reinforced Polymer Products and Application in Malaysia.
- Prof. Madya Dr. Abd. Rahman Mohd Sam
- Universiti Teknologi Malaysia (UTM)
.
15/02/2005
14/02/2006 (30/06/2004) (Extended to 21/12/2006)
RM189,600.00
Completed
8
Excavatability of Unclassified Hard Materials.
- Prof. Madya Mohd For Mohd Amin
- Universiti Teknologi Malaysia (UTM)
.
15/02/2005
14/02/2007 (14/08/2007) (Extended to 14/11/2007-14/02/2008)
RM392,500.00
Completed
9

Blended Cement for Waterproofing Applications.
- Prof. Madya Dr. Lee Yee Loon
- Universiti Tun Hussein Onn Malaysia (UTHM)
.
01/10/2003
30/09/2005 (Extended to 30/09/2006)
RM1,378,400.00
Completed
10

Limit State Design Method for Malaysian Timber Joints.
- Prof. Ir. Dr. Mohd Zamin Jumaat
- Universiti Malaya (UM)
.
15/09/2004
31/01/2007 (Extended to 30/04/2007)
RM202,000.00
Completed
11

Construction Practices for Stormwater Management and Soil Erosion Control for the Construction Industry.
- Prof. Ir. Dr. Ruslan Hassan
- Universiti Teknologi MARA (UiTM)
.
10/12/2001
09/12/2004 (Extended to 31/05/2007)
RM356,400.00
Completed
12

Waste Minimization and Recycling Potential of Construction Materials.
- Prof. Madya Dr. Joy Jacqueline Pereira
- Universiti Kebangsaan Malaysia (UKM)
.
10/12/2001
09/12/2004 (Extended to 31/07/2005)
RM682,920.00
Completed
13

Environmental Management Plan in the Contract Tender Documents of Construction Projects.
- Prof. Ir. Dr. Omar Abdul Kadir
- Universiti Sains Malaysia (USM)
.
27/10/2004
26/10/2006 (Extended to 02/05/2007)
RM583,830.00
Completed
14

Achieving Sustainability of the Construction Industry via International Enviromental Management Systems Standard, ISO 14001.
- Prof. Madya Dr. Nik Norulaini Nik Ab. Rahman
- Universiti Sains Malaysia (USM)
.
27/10/2004
26/10/2007
RM531,540.00
Completed
15

Production of Advanced Polymer Composite Structural for Waste Treatment using Pultrusion Method.
- Prof. Madya Dr. Hazizan Md. Akil
- Universiti Sains Malaysia (USM)
.
15/02/2005
14/02/2007 (Extended to 16/08/2007-30/04/2008)
RM717,000.00
Completed
16

Ceramic Foam Core Sandwich Composites for Structural Applications.
- Prof. Dr. Hj. Zainal Ariffin Ahmad
- Universiti Sains Malaysia (USM)
.
15/09/2004
16/09/2006 (Extended to 31/12/2006)
RM452,000.00
Completed
17

Deformation Characteristics of Malaysian Fired Clay-Bricks for Masonry Structures.
- Prof. Madya Dr. Badorul Hisham Abu Bakar
- Universiti Sains Malaysia (USM)
.
01/07/2003
30/06/2006 (30/12/2006) Extended to 31/03/2007)
RM258,676.00
Completed
18

Roofing System in East Malaysia - Assessment of Thermal Comfort and Rainwater Outfall Systems.
- Prof. Madya Dr. Ideris Zakaria
- Universiti Malaysia Sabah (UMS)
.
01/02/2003
31/01/2003 (Extended to 30/11/2005)
RM396,900.00
Completed
19

Pre-Cast Reinforced Concrete Pilecap.
- Prof. Madya Dr. Chan Toong Khuan
- Malaysia University of Science and Technology (MUST)
.
01/07/2003
30/06/2005 (Extended to 31/05/2006)
RM164,760.00
Completed

 